Friends of Rocky Prairie    

PO Box 140
Tenino, WA  98589

360-866-7596

 

 
Home
Action Alerts and Updates
Donate - Help Save Rocky Prairie
Citizens' Rezone
Contacts
Environmental Groups & Other Resources
Events  New!
History
InterLocal Agreements &
Port Information
Location and Maps
Maytown Site Background
Millersylvania State Park & its Planned Expansion
Our Vision - Rocky Prairie Preserve
What You Can Do & Contact Information
Zoning
 
Concerns about the previously proposed SSLC:
  Air Quality
  Community Concerns
  Environmental Considerations & Endangered Species
  Hazardous Materials
  Homeland Security
  Jobs?
  Noise and Light Pollution
  Proposed SSLC Usages
  Real Estate Values
  SSLC Variance Considerations
  Status of SSLC
  Traffic
  Tribal Concerns
  Water /Headwater of Salmon-bearing Streams

Friends of Rocky Prairie

Proposed SSLC Usages

The following uses have been proposed for the South Sound Logistics Center (SSLC):

  • Sorting – The Ports would transport cargo off-loaded from ships to be transported to the SSLC for sorting. This could possibly include some of the hazardous substances currently regulated from entering the Port of Olympia due to an ordinance in effect in the city of Olympia.

  • Freight Distribution – It would serve as a center to receive Port cargo, which has been transported by trains to the Logistics Center to be sorted and loaded on trucks for transportation to other areas. Much of this freight will be coming from numerous overseas locations, mostly through the Port of Tacoma, and some through the Olympia Port.

  • Truck Cargo – Freight arriving by truck at the SSLC would be transported via rail to the Ports of Tacoma and Olympia for shipping overseas.

  • Train Assembly – The property’s long layout could allow for full trains to be assembled, possibly more than one at a time, before traveling to their final destinations.

  • Rail Holding Area – Trains could be held during peak mainline congestion times until rail lines were free for usage.

  • Rail Related Activities – The remaining acres might be occupied by rail-dependent manufacturing centers, rail maintenance, service shops, and rail operation and rail dispatch centers.

  • Manufacturing – The Port of Tacoma might lease or sell remaining acres for development of manufacturing centers, including chemical manufacturing.

  • Housing – The Port of Tacoma may use the Rural Residential area to develop housing.

  • Gravel Mining – According to the Port of Tacoma, they have procured two permits from the Department of Natural Resource’s approval for reclamation, which is to restore the land after the mining process, and are in process for more. They claim to be seeking this to “retain the value” of the property. A permit for the property was granted to former owners Citifor Inc. in January of 2006 for gravel mining through a mitigated settlement. All of the mitigated settlement conditions, with the possible exception of the large fund granted for water monitoring, “ride with the land” and are still in place for any new owners who might mine the property.

  • Warehousing – The Port could construct high-cube warehousing for storage of goods imported from overseas. The plans that were submitted by ProLogis for the former owners, Citifor Inc., showed four huge warehouses that totaled 3,026,00 square feet and required a height variance.

  • Storage of TEU’s, which are twenty-foot equivalent container units that are 8 feet by 8 feet and hold 1,280 cubic feet of cargo. These containers come directly off the ships at the Port and are loaded onto rail cars. The Port of Tacoma is the 7th largest “container Port” in the US, with 2.1 million TEUs arriving annually at the Port and an estimated 5 million annually by the year 2015.

  • Municipal Solid Waste – A possible transfer facility. Essentially, a good source of revenue.

The Ports began an 18-month feasibility study in the summer of 2006. They have passed the 18-month period and have not yet given the public a clear determination, though plans are underway for the development of the South Sound Logistics Center. When they announce their plans, development will take between 3-5 years.

Below, please see an example of TEU’s (20-foot equivalent container units.) The Port of Tacoma is the 7th largest container Port in the US and the 6th largest in North America.

 

picture of TEUs (20-foot equivalent containers) at the Port of Tacoma

 